Purchasing and inventory

Material ready before the order is released

Purchasing in Industric starts from each project's bill of materials. Before scheduling a machine, you know what material is in the warehouse, what is on its way and what is missing.

Module sheet
Code
SCM
Available in
Pro and Enterprise

01The problem

When purchasing cannot see what production needs

Rush orders, shortages and duplicate material appear when purchasing and the shop floor work from different information.

  1. The machine waits for material

    The order is released and the steel has not arrived yet.

  2. Follow-up by email

    Quotes and purchase orders scattered across emails and phone calls.

  3. Inventory that does not add up

    The same material is used for two orders, or something already in stock is bought again.

02Demo

From the bill of materials to receiving

Every purchasing document stays tied to the project. Material availability tells you whether the order can go to the machine.

  1. RequisitionPR-0057From the BoM · 3 lines
  2. QuoteRFQ · 3 suppliersPrice and lead time compared
  3. Purchase orderPO-0221H13 steel · delivery 16/10/2026
  4. ReceivingWarehouse ALM-01Inspection and reservation for the WO
WO-2026-0014 / Availability

67% of materials ready

The cavity order can go to the machine. The inserts are waiting on H13 steel.

MaterialLocation / documentStatus
MAT-0031 P20 steelALM-01 · E-04 · PO-0219Received · reserved
MAT-0045 H13 steelPO-0221In transit · 16/10/2026
MAT-0102 Cutting insertsPR-0057Quoting

Sample view · illustrative data · today 14/10/2026

03How Industric solves it

Every feature, tied to a result

  • Full purchasing cycle

    Requisition, request for quote, purchase order and warehouse receiving, all tied to the project.

  • Readiness Score

    The percentage of a project's materials that are ready. It shows whether an order can be released to the machine or something critical is missing.

  • Supplier history

    Prices, response times and on-time delivery for each supplier.

  • Materials catalog

    Unified materials with standardized specifications, dimensions and grades.

  • Warehouses and locations

    Stock by warehouse, aisle and shelf, with every receipt, issue or adjustment recorded so it cannot be altered later.

  • Reservation by work order

    Existing material is assigned to a WO so it is never used twice.

Industric / Requisitions and purchase orders in Industric
Industric purchasing module with requisitions tied to the project
Actual product screenshot

04How it works

From the bill of materials to receiving

  1. The BoM defines which materials and consumables the project needs.

  2. What is already in stock is reserved and a requisition is created for what is missing.

  3. Purchasing quotes and issues the purchase order to the supplier.

  4. The warehouse receives the material and the project's Readiness Score updates.

05FAQ

About purchasing and inventory

What is the Readiness Score?

The percentage of materials available for a project. It tells the planner whether production can be released or critical inputs are still missing.

Does it replace my accounting system?

No. Industric manages operational purchasing; accounting stays in your current system, and Industric integrates with accounting systems such as Siigo.

Can I track stock by location?

Yes. Inventory is managed by warehouse, aisle and shelf, with a movement log that cannot be modified afterwards.