CNC machining

Every part, every machine, every hour

For milling, turning, EDM, grinding and prototyping shops running short and medium series. Industric tells you which part is on which machine, how much actual time it has taken and whether it met its requirements.

01What happens in a CNC shop

Many small orders, the same machines

  1. Which machine is busy?

    Knowing each machine's status means walking to the shop or asking on WhatsApp.

  2. Time that never gets logged

    Without actual hours per part, you cannot tell whether an order was profitable or how to quote the next one.

  3. A complaint becomes an investigation

    When a customer complains, finding which part came off which machine with which drawing takes days.

02Sector workflow

From order to shipped part

In a CNC shop the order becomes operations by machine. Each operation keeps its actual time, its operator and its inspection.

  1. Sales

    Order and drawing

    Quantity, material and committed date.

    WO-2026-0031
  2. Warehouse

    Raw material

    Bar or plate reserved for the order.

    MAT-0072
  3. Programming

    Program and setup

    Current drawing and program alongside the order.

    DMS
  4. Operator

    Machine operation

    Time per part logged with a PIN.

    LATHE · CNC
  5. Quality

    Inspection

    Drawing dimensions measured and recorded.

    QMS
  6. Customer

    Shipping

    Lot released with its traceability.

    Portal
WO-2026-0031 / Lot of 120 bushings · 4140 steelIn progress
OperationMachineActual / standard per partProgressStatus
Op. 10 · OD turningLATHE-0703:52 / 04:00120 / 120Done
Op. 20 · Drilling and tappingCNC-0302:41 / 02:3074 / 120In progress
Op. 30 · Dimensional inspectionMetrology—1st pieceConforming
Op. 40 · Packing and shipping——0 / 120Pending

Sample project · illustrative data · today 14/10/2026

03How a CNC shop uses it

The modules that matter most for machining

  • Shop floor

    Work orders (WOs) by part and machine, operator PIN time tracking, on-screen work instructions and a machine occupancy map.

  • Quality

    Inspection against the drawing, nonconformances tied to the order and release before shipping.

  • Document management

    The current program and drawing alongside every order, with no printed copies.

  • Purchasing and inventory

    Raw material reserved for each order and requisitions for what is missing.

  • Planning

    An order schedule with committed dates in view.

04FAQ

About Industric for CNC shops

Does it work for short runs and prototypes?

Yes. Each order is handled as a project with its work orders, whether it is a few parts or a medium series.

How do operators log their time?

From a tablet or screen at the machine, with their name and a PIN, they start and pause the timer for each task.

Can I tell which part came off which machine?

Yes. Each part's history records who worked on it, on which machine, how long it took, its photos and its inspections.

Demo

See it with an order like yours

In the demo we walk through a machining order from start to finish. We reply within one business day to schedule it.