Quality management (QMS)

No part moves on without meeting its requirements

Industric ties critical dimensions and tolerances to the drawings, guides in-process inspections and blocks release until Quality approves it. Nonconformances stay tied to the part and the order where they happened.

Module sheet
Code
QMS
Available in
Pro and Enterprise

01The problem

Quality checked at the end comes too late

When inspection happens at close-out and nonconformances are written in a separate log, the same mistakes repeat.

  1. Paper inspections

    Inspection sheets get lost and a customer audit takes days of searching.

  2. Loose nonconformances

    The problem is recorded, but with no link to the order, the part or the cause.

  3. Parts moving on without approval

    A part goes to assembly or shipping without Quality having released it.

02Demo

From the drawing requirement to the corrective action

The inspection is recorded against the drawing tolerances. An out-of-tolerance result opens a nonconformance and blocks release.

PRT-0811 / Inspection planRelease blocked
RequirementNominalMeasuredResult
Cavity diameter38.00 ± 0.02 mm38.01 mmConforming
Parting face flatness≤ 0.01 mm0.008 mmConforming
Roughness Ra≤ 0.4 µm0.6 µmNonconforming
Fit at assembly——Pending
NCR-0003 / 8D methodOpen

Roughness out of tolerance on PRT-0811

  1. D1
  2. D2
  3. D3
  4. D4
  5. D5
  6. D6
  7. D7
  8. D8
  • D3 · Containment: 4 cavities on hold, re-polishing scheduled.

  • D4 · Root cause: 5 Whys analysis in progress with the EDM team.

Sample view · illustrative data · today 14/10/2026

03How Industric solves it

Every feature, tied to a result

  • Drawing requirements

    Critical dimensions and geometric tolerances tied to each part's technical drawing.

  • Inspection plans and audits

    Dimensional and functional checklists in process and at end of line.

  • Nonconformances (NCRs) with 8D

    Team, description, containment, root cause (Ishikawa or 5 Whys), corrective actions, validation, prevention and closure.

  • Release gates

    A deliverable or shipment stays blocked until Quality signs off the inspection.

Industric / Quality requirements and release in Industric
Industric quality module with inspection requirements and release status
Actual product screenshot

04How it works

From inspection to corrective action

  1. Define the requirements for the part from the drawing.

  2. Inspect in process and at the end, with the inspection plan on screen.

  3. Log the nonconformance if something fails, tied to the part and the order.

  4. Close it with 8D: containment, root cause and corrective action, so it does not happen again.

05FAQ

About quality in Industric

What is the 8D method?

An eight-discipline method for solving quality problems: from forming the team and containing the problem to finding the root cause, correcting it and preventing it from happening again.

What is a release gate?

A checkpoint: the deliverable does not move on or ship until Quality signs off the inspection.

Can I show the history to a customer or auditor?

Yes. Inspections and nonconformances are recorded by part and by order, ready to review.

Demo

See it with a project like yours

In the demo we walk through a project from start to finish. We reply within one business day to schedule it.