Management system for make-to-order manufacturing

From engineering to shipping, on one platform

Industric tracks projects, work orders, materials, quality and shop-floor progress for mold and die shops, CNC machine shops, special machinery builders and metal fabricators that build to order.

Molds and diesCNC machiningSpecial machineryMetal fabrication

Project / WO-2026-0014 / Schedule2 d behind

4-cavity injection mold · 38 mm cap

Sample customer · ASM-0142

Rev. C
Due date
07/11/2026
Actual progress
58%
Baseline
64%
Task
06/1013/1020/1027/10
T01013D design and drawings
PO-0219P20 steel received
T0103Plate roughing
PRT-0811EDM cavities
PRT-0812Inserts · waiting on material
ASM-0142Assembly and fitting
MILESTONET1 tryout with the customer
PlanActualCritical pathBlockedMilestone
Sample view · illustrative data · today 14/10/2026

01The problem

What gets lost today between spreadsheets, WhatsApp and the shop floor

When the office, engineering and the shop floor work from different information, delays are discovered when it is too late to fix them.

How each situation changes when information lives in one system
TodayWith IndustricResult
Progress is asked for on WhatsApp and arrives lateOperators log time and photos with their PIN at the workstationReal progress by part and machine, without calling anyone
An outdated drawing is circulating on the floorEvery drawing is tied to its part and only the released revision is visibleParts are built to the current revision
A machine waits for material nobody orderedThe bill of materials creates the requisition and the purchase stays tied to the projectMaterial is ready before work starts
The delay is discovered on the delivery dateThe critical path and the baseline show the variance every dayThere is time to reschedule and tell the customer

02How it works

One project, start to finish, in the same system

Each stage uses the data from the one before. Nobody re-enters what another team already recorded.

  1. Project and schedule

    Create the project with its milestones and due date. The Gantt chart calculates the critical path.

    WO-2026-0014
  2. Engineering and bill of materials

    Assemblies, parts and consumables in a bill of materials (BoM) with their drawings and revisions.

    ASM-0142
  3. Purchasing and materials

    Requisition, quote, purchase order and receiving, all tied to the project.

    PO-0219
  4. Shop-floor production

    Work orders by part and machine. Operators log their time with a PIN.

    PRT-0811
  5. Quality

    Inspections against the drawing requirements. Nonconformance reports (NCRs) stay tied to the part.

    NCR-0003
  6. Delivery to the customer

    The customer checks milestones and deliverables in their portal, without asking for reports by email.

    Portal

03The product at work

Every capability, tied to a result on the shop floor

The same sample project, seen from each module.

Know in time what puts the delivery at risk

  • Gantt chart with dependencies and milestones per project

  • Critical path: the activities that set the delivery date

  • Baseline to compare what was agreed with what actually happened

  • Alerts when a task runs over its planned time

See Planning and APS
WO-2026-0014 / Critical pathBaseline 01/10/2026
TaskPlanned finishActual / forecastVariance
T0103 Plate roughing15/10/202616/10/2026+1 d
PRT-0811 EDM cavities22/10/202623/10/2026+1 d
PRT-0812 Inserts19/10/2026—Blocked
ASM-0142 Assembly and fitting30/10/202603/11/2026+2 d

Sample views with illustrative data · See all eight modules

05Traceability

Every part keeps its complete history

Who worked on it, on which machine, how long it took, with which drawing and with what inspection result.

  • People

    Every record is signed by whoever made it, from the office or from the workstation.

  • Parts and machines

    Time, photos and status by part, operation and machine.

  • Documents and events

    Drawing revisions, purchases, inspections and nonconformances in chronological order.

PRT-0811 / Part historyCavity · rev. C
  1. Drawing rev. C released ECO-0005Engineering · replaces rev. B at every workstation

  2. Material received and reserved MAT-0031Warehouse · tied to PO-0219

  3. Roughing on CNC-01 · 3:20 hOP-04 · before and after photos

  4. EDM on EDM-02 · 5:10 hOP-09 · 0:10 h over budget

  5. Inspection: roughness out of tolerance NCR-0003Quality · release blocked

06Access

Office, shop floor and customers, each with their own entrance

Everyone sees what they need for their job. Your customer sees progress, not your costs.

Office

Management, engineering, purchasing and quality

Full access to projects, BoM, schedule, purchasing and reports, with role-based permissions.

Shop floor

Operators and technicians

They pick their name and enter a PIN on the workstation tablet or screen. No email needed.

Customers

Your customers' buyers and managers

They sign in with a secure link sent to their email and see milestones, dates and deliverables for their projects.

07What sets it apart

Built for the shop, not adapted from something else

Industric does not replace your accounting system: it covers the technical operation that spreadsheets, ERPs and task managers leave unsolved.

CapabilitySpreadsheets and WhatsAppAccounting ERPTask managerIndustric
Progress reported from the machineManualNoManualYes
Assemblies, parts and consumables (BoM)ManualDepends on the ERPNoYes
Engineering change controlNoNoNoYes
Project critical pathNoNoDepends on the toolYes
Invoicing, payroll and accountingManualYesNoStays in your ERP
Does Industric replace my ERP or accounting software?

No. Industric manages the technical operation: projects, engineering, shop floor, quality and purchasing. Invoicing, payroll and accounting stay in your current system.

Does it work for a small shop?

Yes. It is designed for companies that build to order, from shops with a few users to operations with several departments. Plans differ by number of projects, users and modules.

Do operators need an email address or a computer?

They do not need a company email. They sign in by picking their name and entering a numeric PIN on a tablet, a phone or a shared screen at the workstation.

Can my customers see the progress of their order?

Yes. In the customer portal they see milestones, dates and deliverables for their projects. They do not see costs, margins, purchases or suppliers.

Do I need to install anything?

No. Industric runs in the cloud and is used from the browser on a computer, tablet or shop-floor screen, with no local servers.

Can I connect AI tools to my data?

Yes. In addition to Gilby AI, you can connect assistants such as Claude, Cursor or ChatGPT through MCP, using a service account limited to the tools you authorize.

09 · Get started

See Industric with a project like yours

In the demo we walk through a project from start to finish: schedule, shop floor, quality and purchasing. We reply within one business day to schedule it.