Electrical panels

Every panel, from drawing to acceptance testing

For builders of electrical, control and automation panels that work by project: switchboards, motor control centers and control cabinets. Industric connects design, bill of materials, purchasing, assembly and testing.

01What happens at a panel builder

Hundreds of components per project and a drawing that keeps changing

  1. One component is missing and the panel stops

    A breaker or a drive with a long lead time is ordered late because nobody checked the list against inventory.

  2. The shop wires from an old drawing

    The electrical drawing revision arrives by email and the wiring is done to the previous version.

  3. Test results live on a loose sheet

    When the customer asks for the test report, someone has to rebuild it.

02Industry workflow

From order to a tested, delivered panel

At a panel builder every order is a project with engineering, purchasing and assembly. Each step keeps its drawing, its materials and its test.

  1. Sales

    Order and specification

    Scope, standards and date.

    PRJ-2026-0031
  2. Engineering

    Drawings and bill of materials

    Approved revision tied to the project.

    BoM
  3. Purchasing

    Components

    Ordered by phase with arrival dates.

    Purchasing
  4. Shop

    Assembly and wiring

    Hours logged with a PIN.

    MES
  5. Quality

    Testing

    Test report per panel.

    QMS
  6. Customer

    Delivery

    As-built drawings and deliverables in the portal.

    Portal

03How a panel builder uses it

The modules that matter most for electrical panels

  • BoM and engineering

    Electrical bill of materials per panel, with its revisions and engineering changes.

  • Purchasing and inventory

    Components reserved per project and requisitions for what is missing, with arrival dates.

  • Document management

    Electrical drawings and their approved version tied to the project and the panel.

  • Shop floor

    Assembly, wiring and testing as tasks with an owner and actual time.

  • Quality

    Test reports, nonconformances and release before delivery.

  • Customer portal

    Your customer approves drawings and follows the project without asking for reports.

04FAQ

About Industric for electrical panel builders

Does Industric design the electrical drawings?

No. Drawings are made in your electrical design software; Industric stores the approved version, ties it to the project and controls its revisions.

Does it work for projects with several panels?

Yes. Each panel can be handled as a part of the project, with its own bill of materials, progress and tests.

Can I see which components are missing before assembly?

Yes. Matching the bill of materials against inventory and purchasing shows what is missing and when it arrives.